On September 25th we were assigned a project brief. The brief asked us to film and edit a music video together within a group. We were each decided among us what role everyone would play within our group.

Roles

Alex Desbruslaishttps://www.tumblr.com/blog/hiryuakagi (Director) 

Thomas Murrayhttps://www.tumblr.com/blog/thomas-m-nescot-music-video
(Camera Man)

Luis(Actor)

Kristian/myself(Camera Man) 

The Risks Involved with the project

As well as our main roles that we took up during the production stage we also had roles assigned to us for Pre-Production by our director (Alex). I was assigned to talking about the potential risks that come with us filming in certain locations.